voltage-restrained time overcurrent is common in generator protection and stright 50/51 is often not used. This leads to overly conservative trip times for generator breakers. It would be great if EasyPower could use the reduced voltage settings f...
Greatly improve the annotations portion of Easypower (Note, Note w/Leader, Box, Line):
Ability to set 'default' behaviour for all annotations (eg: fonts, line weights, arrow type, etc..). The way it should work:
When any annotation tool is sel...
User Specified Electrode Gap in Open Air Arc Flash
As of right now, when a user specifies a bus as "open air" in order to use the arc flash options for "open air" calculations, the open air calculations force the electrode gap to the values from NFPA 70E Annex D.8 based on voltage, which are often...
Of all the physical device to not include on the one-line (and most of them are included) having the ability to show and edit the cable (or bus duct or perhaps overhead line) symbol would make it easier to recognize one the one-line
We recently added protection to the model but did not immediately verify the changes in the time-current curve. When we did look at the TCC sometime later, it looked like the original one-line with no indication of any changes. We missed the added...
A common practice in the utility world is to place three EPR 15kV insulated cables with tape shield and one bare neutral return. Please add the option of a bare copper cable in the neutral tab.
It will be great to have a comparaison tools between two or more modeles as I faced many times what version of the modele is the most updated specially when we loose track of the model or also when two firm works in the same model then at the end ...
It would be nice to show violations of Equipment Duty ratings in the arc flash table in a separate column. Being able to automatically apply that information to a label is something many clients ask for.